12.04.050 Bonds or other written evidence to be filed.
A. No plans approval shall be issued pursuant to Sections 12.04.010 and
12.04.020 unless there is filed with the application the following:
1. A
performance guarantee in the form specified in Sections 12.16.040 and 12.16.050
sufficient to satisfy the public works superintendent that the work shall be
done in accordance with city standards and specifications.
2. A maintenance
bond or other written evidence in a form approved by the city attorney
guaranteeing the work performed for a period of one year after completion of the
project (“warranty period”) and written acceptance by the
superintendent. The maintenance bond may be incorporated in and made a part of
the construction bond.
3. The applicant shall file satisfactory evidence of
insurance protecting and saving harmless the city, its officers, agents and
employees from all claims for damages or injury to other persons by reason of
such alteration work prior to acceptance and for a period of one year
thereafter. Such insurance, if required, shall be in not less than the amount
specified in ORS 30.270 and the evidence thereof shall be in a form approved by
the city attorney.
B. Prior to final acceptance and start of the one-year
warranty period, the applicant’s engineer must submit the
following:
1. Five sets of black line prints of as built drawings prepared
and certified by a registered professional engineer licensed by the state of
Oregon;
2. All additional easements required due to construction changes
accompanied by a drawing showing area covered by said easement plus legal
descriptions as applicable;
3. Such other information as the public work
superintendent shall deem necessary for final acceptance.
C. Prior to final
acceptance and start of the one-year warranty period for a sanitary sewer
project, the applicant’s engineer shall notify the public works
superintendent that the system is complete and ready for pre-final inspection.
The applicant shall cause inspection of the system by means of a closed circuit
TV camera to assure that there are no cracks in the pipe, that all joints are
tight, the deflection is within acceptable tolerances and that there are no
conditions apparent which would permit the infiltration of ground water into the
system. (Prior code § 2.140)