3.20.040 Permit applications.
Applications for permits to construct facilities within the public
right-of-way shall be submitted on forms to be provided by the city and shall be
accompanied by drawings, plans and specifications. The drawings, plans and
specifications must:
A. Provide sufficient detail to demonstrate that the
facilities will be constructed in accordance with all applicable codes, rules
and regulations;
B. Demonstrate that the facilities will be constructed in
accordance with the franchise agreement;
C. Provide the location and route
of all existing facilities and the location and route of all new facilities to
be installed underground, on or above a public right-of-way including the line
and grade proposed for the burial of all points along the route that are within
the public right-of-way. Existing facilities shall be distinguished from new
construction;
D. Provide a cross-section showing new or existing facilities
in relation to the street, curb, sidewalk or right-of-way;
E. Provide a
summary of -the construction methods to be employed in performing the work and
the means to be used to protect existing structures, fixtures, facilities which
are within or adjacent to the public right-of-way including a description of any
improvements that the applicant proposes to temporarily or permanently remove or
relocate; and
F. Provide a written construction schedule which shall include
a deadline for completion of construction. The construction schedule is subject
to approval by the city. (Ord. 2000-33 § 1 (part): prior code §
1.921)